NR Lynx headed over to Liverpool at the weekend for some TLC including a hull scrub, anti foul, deck painting, engine cooler plate cleaning and other minor maintenance.
The NR Lynx was built and commissioned by Alicat in Great Yarmouth in 2013 originally called the Spirit of Hoton for Eon. The vessel operated from Grimsby to the Humber Gateway offshore windfarm as their operations vessel. The vessel was purchased by NR Marine Services in February 2020 and given a refit including new kitchen area, Paintwork and deck crane. NR Lynx has gone onto work on the Greater Gabbard Offshore Windfarm and the Gwynt y Mor offshore Windfarm.
Length OA | Beam OA | Depth | Draft |
---|---|---|---|
16.95m |
6.7m |
2.4m |
1.18m |
Supporting documents
Click link to download and view these filesNR-Lynx-Vessel-Spec-Sheet
PDF, FileSizeText 0.49 mb