Stabilisation and consolidation of the rock faces at the Bighi foreshore through the installation of rock anchors, shotcrete, and high-tensile stainless-steel mesh.
MCJ Ref No: 1444/E/02
Project Stage: Early Information
Area: Luqa, Malta
Promoter: Infrastructure Malta, Vjal l-Avjazzjoni, Luqa, LQA 9023
E-mail: procurement.im@infrastructuremalta.com; Tel: +356 233 412 11
Profile: A future tender for the consolidation of the Bighi foreshore and walls and restoration of the overlying Bastion walls. The scope of this tender includes the stabilization and consolidation of the rock faces at the Bighi foreshore through the installation of rock anchors, shotcrete, and high-tensile stainless-steel mesh. Once the foreshore is secured, the fortification walls’ foundations will be reinforced by installing a structural beam at the toe of the walls and anchors for additional support. Further consolidation will be achieved by strategically placing anchors within the walls.Dated: 27/02/2025