ICMS upgrades berthing base for wind farm

Floating concrete breakwater at Newhaven

Source: Inland and Coastal Marina Systems

Inland and Coastal Marina Systems has installed a floating concrete breakwater at Newhaven to berth crew transfer vessels for the Rampion offshore wind farm.

The Port of Newhaven’s floating concrete breakwater has been built as part of the refurbishment for its purpose-built operations and maintenance base for the wind farm.

This is premium content

Already a member? SIGN IN now

V2-MJ

Sign up for FREE to continue this article…

It only takes a minute to sign up for a free account, and you’ll get to enjoy:

  • Weekly newsletters providing valuable news and information on the commercial marine sector
  • Access to the Maritime Journal Industry Database
  • Monthly Maritime Journal Magazine (Restricted digital edition)
  • Website access (3 standard news articles per month)

Get access and more free content sign up today

Does your organisation require more access? Upgrade to a subscription and enjoy unlimited news and additional features.